业务与能力Capabilities

每一件做的东西,
都是为了让现场少改一次。
Everything we make exists
to save a change on site.

下面按业务线列的是我们实际在做、也正在交的范围。规格栏写的是合同与图纸里的真实口径,不是宣传语——如果你需要的比这更严,先告诉我们,我们评估能不能做,不承诺做不到的事。 What follows is what we actually do and are delivering now. The spec column carries the real figures from contracts and drawings, not marketing. If you need tighter than this, tell us first — we will assess it, and we will not promise what we cannot hold.

首页Home / 业务与能力Capabilities
01 · 深化设计与算量01 · Detailing & take-off
ST-01
图纸识读与疑问清单Drawing reviewST-01 / REVIEW
读结构图、节点图、材料表,识别构件规格、数量、材质与表面处理要求。图上没有依据的留空标注,出疑问清单给总包与顾问确认,不自行判断。Structural and detail drawings and schedules read to extract member size, quantity, grade and finish. Where the drawing gives no basis we leave it open and issue a query list rather than decide for the designer.
响应Turnaround收图后 48 h48 h from receipt
ST-02
钢结构算量与 BOQSteel take-off & BOQST-02 / MEASURE
按图算钢材重量(吨)、表面积、螺栓数、焊接量与涂装量,区分制作与安装、永久与临时。合计由明细现算,保留计算过程可复算。Weight in tonnes, surface area, bolt counts, weld length and coating area, separated into fabrication and installation, permanent and temporary. Totals are summed from the detail and left open to re-check.
计价口径Basis实做实量Re-measurement
ST-03
深化图与加工图Shop drawingsST-03 / SHOP DWG
出可直接下料的加工图:构件编号、断料尺寸、孔位、坡口、焊接符号、涂装要求与重量。按项目规范与总包图框出图,供 PE 背书与报批。Fabrication-ready drawings: mark numbers, cut lengths, hole positions, preparations, welding symbols, coating and weight. Issued to project standards and the main contractor's title block for PE endorsement.
出图依据BasisLTA / BCA 规范codes
ST-04
报批配合Approval supportST-04 / SUBMISSION
PE 计算书与签图、NCE 申报、COS、地下管线探测与试挖、LEW/EMA 申报。这些程序走不完人进不了场,所以我们放在报你价之前就说清。PE calculations and endorsed drawings, NCE submissions, COS, utility detection and trial trenching, LEW/EMA applications. These clearances gate site access, so we raise them before quoting rather than after award.
覆盖CoversPE / NCE / COS
02 · 临时围挡系统02 · Temporary hoarding
HD-01
彩钢围挡(3 / 5 / 7 m)Colour-steel hoardingHD-01 / PANEL
立柱 SHS 63.5×63.5×3.0,配锌铝涂层压型钢板,三档标准高度。固定式与移动式两种基座做法,按现场通行需求排布。SHS 63.5×63.5×3.0 posts with zinc/aluminium-coated ribbed sheeting in three standard heights, on fixed or mobile bases to suit site access.
高度Height3 / 5 / 7 m
HD-02
Prestige 围挡Prestige hoardingHD-02 / PRESTIGE
面向业主展示面的高档围挡,板面平整度与拼缝直线度控制更严。含收边、压顶与转角件,整体观感按开发商要求交付。Presentation-grade hoarding for owner-facing frontage, with tighter panel flatness and joint alignment. Cappings, trims and corner pieces included to the developer's visual standard.
拼缝Joint gap≤ 3 mm
HD-03
车辆大门Vehicle gatesHD-03 / GATE
8 米宽双开门,高 2100 mm,门柱 SHS 100×100×4.5,配 600×600×400 混凝土独立基础。含门轴、插销与限位,按车流方向定开启侧。8 m wide double-leaf gates at 2100 mm high, SHS 100×100×4.5 posts on 600×600×400 mass concrete pad footings. Hinges, shoot bolts and stays included, handing set to traffic direction.
洞口Opening8.0 m × 2.1 m
HD-04
基础与防雷接地Footings & earthingHD-04 / BASE
预制混凝土墩基础,含开挖、弃土外运与回填;围挡金属体做等电位连接与防雷接地,含接地电阻测试并出记录。废水不得排入河道。Precast concrete pad footings with excavation, spoil removal and backfill; equipotential bonding and lightning earthing to the hoarding, with resistance testing and records. No discharge to watercourses.
接地测试Earth test逐段出记录per section
HD-05
照明、标识与顶棚Lighting, signage, shelterHD-05 / LIGHT
围挡照明灯具与走线、LTA 铝板标识、人行道顶棚与应急照明。按 LTA 图纸位置安装,灯具与支架随围挡同批供货。Hoarding lighting and containment, LTA aluminium logo panels, pedestrian shelter and emergency lighting. Installed to LTA drawing locations, with fittings supplied in the same batch as the hoarding.
依据PerLTA 图纸drawings
HD-06
拆除与场地恢复Dismantle & reinstateHD-06 / REMOVE
围挡拆除、基础破除、回填、地面恢复,材料清运出场。拆除顺序与时间按总包指令,避开交通管制时段。Dismantling, footing breakout, backfill, surface reinstatement and removal of all materials. Sequence and timing to the main contractor's instruction, clear of traffic-control hours.
计价Priced按延米per metre
03 · 基坑钢支撑系统03 · Excavation strutting
SP-01
双拼 H 型钢对撑Twin-section cross strutSP-01 / CROSS
地下连续墙的钢内支撑主受力构件。N108 标段主力截面为双拼 UB610×324×174 与 195 kg/m,材质 S355,单根长 17.0–17.6 m,水平间距 5.3–6.0 m。Primary internal strut for diaphragm walls. On N108 the main sections are twin UB610×324 at 174 and 195 kg/m in S355, 17.0–17.6 m long at 5.3–6.0 m centres.
材质GradeS355
SP-02
角撑与斜撑Corner & raking strutsSP-02 / CORNER
基坑转角部位的水平斜撑,与对撑形成闭合受力体系。节点按墙端预埋钢板与支座板对接,控制安装间隙与初始偏心。Horizontal rakers at excavation corners closing the load path with the cross struts. Connections bear on cast-in wall plates and bearing seats, with gap and initial eccentricity controlled.
连接Connection墙端预埋板cast-in plate
SP-03
预加力施加与监测Preloading & monitoringSP-03 / PRELOAD
按设计逐根施加预加力,N108 各区段 100–650 kN 不等,用千斤顶与压力表读数并记录。配合第三方监测,超限立即报告并复紧。Struts preloaded individually to design — 100–650 kN depending on the N108 zone — by jack against gauge reading, recorded. Coordinated with third-party monitoring; overruns reported and re-tensioned.
预加力Preload100–650 kN
SP-04
连接件与节点板Connection platesSP-04 / NODE
节点板、加劲肋、法兰与高强螺栓组件,连接件材质 S275。节点按受力图配板,焊缝等级与探伤要求按项目规范执行。Gussets, stiffeners, flanges and HSFG bolt sets, with secondary steel in S275. Plates sized to the force diagram; weld class and NDT to project specification.
材质GradeS275
SP-05
租赁与周转Hire & turnaroundSP-05 / HIRE
钢支撑以租赁方式提供整套系统,含进出场运输、现场堆放、安装与拆除。构件进场前校直、除锈并复核截面,周转件逐根编号登记。The strutting system is offered on hire as a package, including transport in and out, site stacking, installation and removal. Members are straightened, cleaned and section-checked on receipt, with every reusable piece numbered and logged.
模式Model整套租赁system hire
04 · 转换层临时支撑与钢平台04 · Transfer propping & decks
PR-01
转换层临时支撑梁Transfer-level propping beamsPR-01 / PROP
高层转换层施工期间的临时支承工字钢。8 Shenton Way 项目在 32 层做约 26.67 吨:H457×191、H533×210、H254×146、H203×133 四档 S355,配 PL20 连接板。Temporary support beams during transfer-level construction. At 8 Shenton Way the Level 32 package runs about 26.67 t in H457×191, H533×210, H254×146 and H203×133 S355 sections with PL20 connection plates.
单批Per batch≈ 26.67 t
PR-02
装配式钢牛腿Assembled steel corbelsPR-02 / CORBEL
焊后整体加工的支承牛腿,与主体结构预埋件对接。构件出厂前完成组焊与涂装,现场只需定位、栓接与少量补焊。Fully welded support corbels mating to cast-in embedments. Welding and coating finish in the shop, leaving setting out, bolting and minor site welds.
数量Qty2 组/批sets/batch
PR-03
钢平台与作业面Working decksPR-03 / DECK
港区与工地用作业钢平台、临时通道、机器基础支承。沿海环境按腐蚀等级配涂层,平台面做防滑与排水处理。Working decks, temporary access and plant support platforms for terminals and sites. Coating selected to the marine corrosivity category, with anti-slip and drainage detailing to the deck surface.
环境ExposureC4–C5 沿海marine
PR-04
拆除与回收Dismantle & recoveryPR-04 / REMOVE
按总包放行指令拆除临时支承,构件回收、清点、退场或转下一项目。拆除顺序与卸载步骤先出方案,经总包与 PE 确认后执行。Removal on the main contractor's release, with members recovered, counted and either returned or transferred to the next project. Sequence and de-propping steps are planned and confirmed before work starts.
前置Requires书面放行written release
05 · 临时钢便桥与桥梁钢结构05 · Temporary bridges
BR-01
临时车辆钢便桥Temporary vehicular bridgeBR-01 / VEHICULAR
施工期车辆通行的钢结构便桥,含主梁、横梁、桥面系与连接件。KTC 项目供货量约 220 吨,按最终加工图数量结算、单价不变,不含现场安装与三方检测。Steel bridge for construction-phase vehicle access: main girders, cross beams, deck system and connections. The KTC supply runs about 220 t, settled on final shop-drawing quantities at fixed rates, excluding site installation and third-party inspection.
供货Supply≈ 220 t
BR-02
行人天桥钢结构Pedestrian overbridge steelBR-02 / POB
人行天桥的主梁、梯道、栏杆与支承节点制作,含吊装分段划分建议。投标阶段同步出算量与安装方案,便于总包判断吊装窗口。Girders, stair flights, parapets and support nodes, with a proposed lift-division for erection. At tender stage we issue take-off and installation method together so the main contractor can judge the lifting window.
配合Includes吊装分段lift division
BR-03
涂层体系Coating systemBR-03 / COATING
按 LTA M&W 规范 Table 12.1 与 BS 5493 执行:镀锌 → 除油 → 一道车间底漆 Coating G(≥80 μm)→ 两道 Coating H(各≥150 μm)。高腐蚀环境干膜总厚不低于 380 μm,不含镀锌层。To LTA M&W Specification Table 12.1 and BS 5493: galvanise, degrease, one shop coat of Coating G (≥80 μm), two shop coats of Coating H (≥150 μm each). Minimum total DFT 380 μm in highly aggressive environments, excluding the galvanising layer.
干膜总厚Total DFT≥ 380 μm
06 · 工厂制作与现场安装06 · Fabrication & installation
FB-01
下料与组立Cutting & fittingFB-01 / CUT
天津基地自动辊轧成型、激光切割下料,工装组对。构件编号、余量预留与焊接收缩补偿按工艺卡执行,断料尺寸可追溯到深化图。Automatic roll forming and laser cutting at the Tianjin base, fitted in jigs. Marking, allowance and weld-shrinkage compensation follow the process card, traceable back to the shop drawing.
基地Base25,000 m²
FB-02
焊接与检验Welding & inspectionFB-02 / WELD
持证焊工按 WPS 施焊,焊缝外观全检,重要节点按规范做 UT/MT。尺寸复核在涂装前完成,超差当场修正不带到工地。Certified welders working to qualified WPS; all welds visually inspected, with UT/MT on critical nodes to specification. Dimensional checks finish before coating, and out-of-tolerance work is corrected in the shop.
焊接Welding按 WPSto WPS
FB-03
抛丸与涂装Blasting & coatingFB-03 / PAINT
抛丸除锈达到规定等级后按体系涂装,逐道测厚并记录。高腐蚀部位与焊接接头处补涂,构件出厂前完成标识与包装。Blasted to the specified grade, then coated to system with DFT measured and recorded coat by coat. Touch-up at welds and high-corrosion areas, with marking and packing complete before despatch.
测厚DFT逐道记录per coat
FB-04
现场安装与安全文件Site installationFB-04 / SITE
卸车、倒运、吊装、校正、栓接焊接与打磨;同步提交 SHEMS 安全资料、RA 风险评估、组织图、PPE 发放与人员证书,经总包审批后进场。Unloading, handling, rigging, alignment, bolting, welding and grinding — with SHEMS documentation, risk assessments, organisation charts, PPE records and manpower certification submitted for approval before entry.
前置RequiresSHEMS 审批approval

不确定哪一条对得上?Not sure which line fits?

把图纸、清单或一段现场描述发过来就行。我们按你的项目口径回一份范围说明,标清哪些含、哪些不含,再谈价格。 Send a drawing, a schedule or even a description of the site. We reply with a scope note stating what is included and what is not — then we talk price.