新加坡 · 钢结构专业分包 Singapore · Steel Structure Subcontractor

钢结构这一包,
交给我们做到验收。
The steel package,
delivered to inspection.

Fortis 在新加坡注册,做钢结构深化设计、材料采购、工厂制作、现场安装与拆除的全流程分包。服务对象是在本地承接工程的中资总包——中国港湾、中铁一局、中建。天津自有制造基地两万五千平方米,锯、冲、割、焊全工艺覆盖。 Fortis is a Singapore-registered steel subcontractor covering detailing, procurement, fabrication, site installation and dismantling as one package. We serve Chinese main contractors working here — CHEC, CRFG, CSCEC — backed by our own 25,000 m² fabrication base in Tianjin with sawing, punching, cutting and welding under one roof.

我们熟悉 LTA 与 BCA 的规范、报批路径和现场要求:PE 计算书、深化图背书、NCE 申报、SHEMS 安全文件、持证人员与 PPE,这些不是附加项,是进场的前提。 We know the LTA and BCA rules, the submission routes and the site expectations — PE calculations, endorsed shop drawings, NCE submissions, SHEMS documentation, certified manpower and PPE. These are not extras; they are the condition of entry.

03 个在施项目Live projects
25,000m² 天津制造基地Fabrication base
26.67t 单批临时支撑钢量Single-batch steel
20,000m 单标段围挡长度Hoarding, one contract
我们做什么What we do

六件事,
串成一条交付线。
Six things,
one delivery chain.

钢结构的分包不是把钢卖掉就完事。深化图对不上现场,构件到工地就得改;报批材料没做全,人进不了场。我们把这条线上每一段都握在自己手里,出问题不用找三家。 A steel subcontract is not a steel sale. If the shop drawing does not match site, the member gets altered on arrival; if the submissions are incomplete, nobody gets onto site. We hold every link of that chain ourselves, so there is no third party to chase.

01 / DETAIL

深化设计与算量Detailing & take-off

按结构图、节点图出可加工的深化图与 BOM:构件规格、材质、数量、表面处理逐项落地。图上没有的依据留空标注,不猜。 Shop drawings and BOM from structural and detail drawings: member size, grade, quantity and finish, item by item. Where the drawing gives no basis, we mark it rather than guess.

  • 深化图Shop dwg
  • 算量Take-off
  • BOMBOM
  • 节点Details
02 / FABRICATE

工厂制作Fabrication

天津基地自动辊轧成型、激光切割、锯冲割焊全工艺。下料—组立—焊接—抛丸—涂装一条线,构件编号后海运到场。 Roll forming, laser cutting and full saw–punch–cut–weld capability at our Tianjin base. Cut, fit, weld, blast and coat on one line; every member marked before it ships.

  • H型钢H-beams
  • 型钢Sections
  • 钢板件Plate work
  • 涂装Coating
03 / INSTALL

现场安装与拆除Install & dismantle

卸车、倒运、吊装就位、校正、栓接与焊接、打磨收口;拆除阶段按总包指令回收退场。含常规机具与耗材。 Unloading, internal handling, rigging, alignment, bolting, welding and grinding; dismantling and removal on the main contractor's release. Normal rigging gear and consumables included.

  • 吊装Rigging
  • 校正Aligning
  • 栓焊Bolt/weld
  • 拆除Dismantle
04 / STRUT

基坑钢支撑系统Excavation strutting

地下连续墙的钢内支撑:双拼 H 型钢、角撑与对撑、预加力施加与监测配合。N108 南北走廊使用 S355 双拼 UB610×324,预加力 100–650 kN。 Internal steel struts for diaphragm walls: twin H-sections, corner and cross struts, preloading and monitoring support. On N108 the system uses S355 twin UB610×324 at 100–650 kN preload.

  • 对撑Cross
  • 角撑Corner
  • 预加力Preload
  • 换撑Transfer
05 / HOARDING

围挡与钢结构围栏Hoarding & fencing

LTA 标准的临时围挡:SHS 立柱、锌铝压型钢板、混凝土墩基础、大门与防雷接地,含人行道顶棚与应急照明。加冷与 RC218 两个标段合计两万米量级。 LTA-standard temporary hoarding: SHS posts, zinc/aluminium ribbed sheeting, concrete pad footings, gates and lightning earthing, with pedestrian shelter and emergency lighting. Kallang and RC218 together run into tens of thousands of metres.

  • 固定围挡Fixed
  • 移动围挡Mobile
  • 大门Gates
  • 照明Lighting
06 / BRIDGE

临时钢便桥与钢平台Temporary bridges & decks

施工车辆通行的临时钢便桥、港区作业平台、转换层支承。供货与涂层体系按 LTA M&W 规范,高腐蚀环境 DFT 不低于 380 μm。 Temporary vehicular bridges, marine working decks and transfer-level supports. Supply and coating to LTA M&W specification — minimum 380 μm DFT in highly aggressive environments.

  • 钢便桥Bridge
  • 钢平台Deck
  • 支承Support
  • 涂层Coating
怎么推进How it runs

五步,从图纸到进场。 Five steps, drawing to site.

新加坡的项目,卡人的往往不是能不能做,是能不能批。报批材料走在前面,钢才走得顺。 On Singapore projects the constraint is rarely whether it can be built — it is whether it can be approved. Submissions run ahead so the steel does not wait.

01

图纸与规范评审Review

核尺寸、材质、公差与本地规范符合性,列出需总包与顾问确认的疑问点。 Check dimensions, grade, tolerance and local-code compliance; list the points needing confirmation.

02

算量与报价Measure & quote

按 BOQ 单价实做实量组价,制作、安装、拆除分别列出,不含项写明白。 Priced from BOQ rates on re-measurement, with fabrication, installation and dismantling listed separately and exclusions stated.

03

深化与报批Detailing

出深化图与计算书,走 PE 背书、NCE 申报、COS 与管线探测等程序。 Shop drawings and calculations, then PE endorsement, NCE submission, COS and utility detection.

04

制作与检验Fabricate

天津基地下料组焊,尺寸复核、焊缝外观、抛丸涂装、逐件编号并出材质证明。 Cut and welded in Tianjin: dimensional checks, weld appearance, blasting and coating, piece marking and mill certificates.

05

到场安装与拆除Install

海运到场后吊装就位,配合总包进度;完工按指令拆除退场、场地恢复。 Shipped, then rigged into place to the main contractor's programme; dismantled and removed on instruction at completion.

在做的项目Current projects

三个工地,
同时在跑。
Three sites,
running at once.

加冷的围挡、南北走廊的钢支撑、盛顿道的转换层支承——一个在装、一个在撑、一个在吊。项目名称、总包、范围均为实际合同口径。 Hoarding at Kallang, strutting on the North-South Corridor, transfer supports at Shenton Way — one being installed, one propping, one being lifted. Names, contractors and scope follow the actual contract wording.

在施 · 围挡LIVE · HOARDING

加冷 Kallang Close 围挡工程Kallang Close hoarding works

CHECBP019090253 / 5 / 7 mSGD 270k

总包为中国港湾工程新加坡分公司。范围:预制混凝土墩基础、三米五米七米固定及移动彩钢与 Prestige 围挡、大门、照明与防雷接地。合同按实做实量结算,2026 年 10 月开工。围挡系统另有一套散件出口交付,3×40HQ、16,338 件、107.881 m³。 Main contractor: China Harbour Engineering Co. Ltd, Singapore Branch. Scope covers precast concrete pad footings, 3/5/7 m fixed and mobile colour-steel and Prestige hoarding, gates, lighting and lightning earthing. Re-measured contract, started October 2026. A separate loose-piece supply of the same system shipped in 3 × 40HQ — 16,338 pieces, 107.881 m³.

在施 · 钢支撑LIVE · STRUTTING

南北走廊 N108 基坑钢支撑N108 North-South Corridor strutting

CRFGLTAS355UB610×324

业主为新加坡陆路交通管理局,总包为中铁一局新加坡分公司,顾问 GeoAlliance。标段位于 Marymount Lane 与 Pemimpin Place 之间,全长 1,113 米,单层双跨地下隧道,地下连续墙加钢内支撑围护。Fortis 提供 R10 区 4A/4B/4C/4D1A 各层钢支撑,双拼 H 型钢 S355,预加力 100–650 kN。 Owner: Land Transport Authority. Main contractor: China Railway First Group, Singapore Branch; consultant GeoAlliance. The 1,113 m single-level twin-cell tunnel between Marymount Lane and Pemimpin Place uses diaphragm walls with internal steel struts. Fortis supplies the R10 zone — sections 4A/4B/4C/4D1A — in twin S355 H-sections at 100–650 kN preload.

在施 · 临时支撑LIVE · PROPPING

8 Shenton Way L32 转换层临时支撑8 Shenton Way, L32 temporary supports

CHEC26.67 tLevel 32S355

总包为中国港湾工程新加坡分公司。项目为盛顿道的综合体开发,工作在 32 层:转换层临时支撑工字钢的制作、安装与拆除。钢结构约 26.67 吨,含 H457×191、H533×210、H254×146、H203×133 等规格与装配式钢牛腿两组,按 L32T SUPPORTING BEAM 图出件。 Main contractor: China Harbour Engineering, Singapore Branch. A mixed-use development at 8 Shenton Way; the work sits at Level 32 — fabrication, installation and dismantling of temporary transfer-level supporting beams, approximately 26.67 t in H457×191, H533×210, H254×146 and H203×133 sections plus two assembled steel corbels, built to the L32T supporting-beam drawing.

已交付 · 港区DELIVERED · MARINE

PSA 新加坡港务集团项目PSA Singapore terminal works

PSA围挡Hoarding信号塔Comms tower冷藏平台Reefer deck

PSA 是全球最大的集装箱中转枢纽。我们承担港区围挡、通信信号塔钢结构、冷藏集装箱平台钢结构的深化设计、采购、工厂制作与现场安装全过程——从图纸到就位,整段交给我们。 PSA operates the world's largest container transhipment hub. We delivered the hoarding, communications tower steelwork and reefer-platform structures through detailing, procurement, fabrication and site installation — the whole span from drawing to final position.

看全部项目All projects

关于我们About us

新加坡注册,
天津有厂。
Registered here.
Fabricating there.

Fortis Structure Pte Ltd 于 2026 年 1 月在新加坡注册,注册号 UEN 202601141D,办公地址在国际商业园 German Centre。我们做钢结构专业分包,客户是在本地承接工程的中资总包。 Fortis Structure Pte Ltd was incorporated in Singapore in January 2026, UEN 202601141D, with an office at German Centre, International Business Park. We work as a steel structure subcontractor for Chinese main contractors operating here.

新加坡这头是新的,但团队不是。核心成员在国内做钢结构多年,制造基地设在天津——天津富拓工程科技有限公司,厂房两万五千余平方米,配全自动辊轧成型机、激光切割机,锯、冲、割、焊全工艺覆盖,产能和配套都成熟。 The Singapore entity is new; the team is not. Our core members have years in steel behind them, and the fabrication base sits in Tianjin — Tianjin Futuo Engineering Technology Co., Ltd., over 25,000 m² of workshop with automatic roll forming and laser cutting, covering sawing, punching, cutting and welding in full.

所以我们能做一件本地小厂不容易做的事:报价时按的是自己的产能,不是别人的排期;赶工时调的是自己的班组,不用等分包。问题出在厂里,就在厂里解决。 That lets us do something a small local shop cannot: quote against our own capacity rather than someone else's programme, and add manpower from our own teams when a date closes in. Problems that start in the factory get solved in the factory.

CompanyFortis Structure Pte Ltd
UEN202601141D
Incorporated2026 年 1 月 · 新加坡January 2026 · Singapore
Office25 International Business Park, #03-13, German Centre, Singapore 609916
Scope深化设计 · 采购 · 工厂制作 · 现场安装与拆除Detailing · Procurement · Fabrication · Install & dismantle
Base天津富拓工程科技有限公司 · 25,000 m²Tianjin Futuo Engineering Technology Co., Ltd. · 25,000 m²
CertificationISO 9001 · ISO 14001 · ISO 45001ISO 9001 · ISO 14001 · ISO 45001
Clients中国港湾 · 中铁一局 · 中国建筑 · PSA · KTCCHEC · CRFG · CSCEC · PSA · KTC

有图纸,就能报价。 Send a drawing. Get a price.

PDF、DWG、Excel 清单都行。把项目、材质、数量和交期写清楚,我们先判断能不能做、要不要报批,再给可核对的报价。 PDF, DWG or an Excel schedule — all fine. Tell us the project, grade, quantity and required date; first we tell you whether it can be built and what approvals it needs, then we price it.